A Jira worklog carries two dates. The work date says when the work happened. The entry date says when someone saved the entry. Select a billing period with the work date.
The two dates on a Jira worklog
When you log work in Jira, the entry stores the date you give in the started field. Jira stores the save time in the created field. Both fields appear on every worklog through the REST API. (Atlassian: Jira Cloud REST API, issue worklogs)
If you log today for yesterday's work, the work date is yesterday and the entry date is today. A later edit changes the update time. It does not move the work date unless you change the date field itself.
Tempo works the same way. Its raw report export carries Work date and Date created as separate columns. Tempo removed the old Log delay column and tells users to calculate that gap from the two dates. (Tempo: Exporting reports)
Which date a billing period needs
A client pays for the hours the team worked. So the work date, which marks the day of that effort, selects the period.
Daylight groups each entry by the day of its work date, read in the person's time zone. The date range in Reports then selects entries with work dates inside the range. This grouping also decides the month an approval covers.
A late entry changes the totals
Late entries make the two dates diverge. Northline Studio is a fictional agency. One person worked on one fictional issue, DATA-104, across the end of October and early November. The downloadable date comparison marks all rows as fictional data.
| Work date | Entry date | Hours |
|---|---|---|
| 2026-10-27 | 2026-10-27 | 3.5 |
| 2026-10-29 | 2026-11-02 | 2.0 |
| 2026-11-03 | 2026-11-03 | 1.5 |
| 2026-11-05 | 2026-11-09 | 4.0 |
| Total | 11.0 |
The 2.0-hour entry shows the gap. The work happened on October 29, and the person saved the entry on November 2.
- October by work date: 3.5 + 2.0 = 5.5 hours.
- October by entry date: 3.5 hours.
- November by work date: 1.5 + 4.0 = 5.5 hours.
- November by entry date: 2.0 + 1.5 + 4.0 = 7.5 hours.
Both splits sum to 11.0 hours, so the totals reconcile. The November invoice built on entry dates would carry 2.0 hours of October work, and the October invoice would miss those 2.0 hours.
Review the month before you submit it
- Open Reports and select Last month.
- Compare the project total with the invoice or grant draft.
- Add missing entries with the correct work date.
- Submit the period for approval.
If the period is already submitted, you can withdraw it with Unsubmit while it is pending. An approved period stays read-only, so a late entry after approval becomes a change made outside the lock. That change shows a changes after submit tag in the submission, and the audit log lists it. (Reports, Exports, and Approvals)
The work date decides the month. Enter time with the right work date, and review the prior month before submission.